This 1931 photo shows the pool
under construction. At its current length of 137 metres (it used to be even
longer), it is the largest salt water pool in North America. It was originally filled by the tidal flow from Burrard Inlet. It was extensively rebuilt in 1979 and again in 2018.
(Major Matthews photo from Vancouver City Archives).